Skip to main content

Arc XP Scheduled Maintenance and Operational Changes

This article provides a list of past and upcoming scheduled maintenance and operational changes that affect your Arc XP environment. Use this information to prepare and take action accordingly.

Application or Feature

Scheduled Maintenance and Operational Changes Date

Subscriptions Database Upgrade

Each region has two brief maintenance windows — a short preparatory step, then the upgrade. During each window, Subscriptions (purchases and retail transactions, sign-ups, logins) and the Subscriptions Admin UI are briefly unavailable, then resume automatically. No customer action is required.

All times are shown in each region's local timezone.

Preparation windows — a quick preparatory step, typically under a minute.

  • ap-southeast-2 (Sydney) — Thu, August 20, 2026, 23:30–01:30 AEST

  • ap-northeast-1 (Tokyo) — Sat, August 22, 2026, 01:00–03:00 JST

  • eu-central-1 (Frankfurt) — Mon, August 24, 2026, 03:00–05:30 CEST

  • us-east-1 (Virginia) — Tue, August 25, 2026, 01:00–03:00 EDT

Upgrade windows — the upgrade itself, typically ~10 seconds, up to 5 minutes.

  • ap-southeast-2 (Sydney) — Mon, August 24, 2026, 23:30–01:30 AEST

  • ap-northeast-1 (Tokyo) — Wed, August 26, 2026, 01:00–03:00 JST

  • eu-central-1 (Frankfurt) — Wed, August 26, 2026, 03:00–05:30 CEST

  • us-east-1 (Virginia) — Thu, August 27, 2026, 01:00–03:00 EDT

Photo Center 1.84.5

Sandbox: February 17, 2026

Production: February 24, 2026